Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2161

Re: Rule based deconsolidation and distributive putaway

$
0
0

Hi Khushboo,


As per SAP Standard ,

Max no of WT in putaway HU setting will not help you in case 2 below for your reference.


Define Attributes for Deconsolidation

Use

In this IMG activity, you can assign the following deconsolidation attributes to your defined activity areas:

  • Maximum number of warehouse tasks (WTs) in the deconsolidation handling unit (deconsolidation HU) as of which deconsolidation must occur
  • Maximum number of WTs in the putaway handling unit (putaway HU)

You need these attributes in process-oriented warehouse control for the process step Deconsolidate. If the number of WTs exceeds the maximum permitted number of WTs in the deconsolidation HU, the deconsolidation HU is directed to a deconsolidation station. There you can distribute its contents to various putaway HUs.

Requirements

You must have defined activity areas.

Standard settings

The Maximum Number of WTs in the Deconsolidation HU should be greater than or the same as the Maximum Number of WTs in the Putaway HU.

Activities

If you want to use the step Deconsolidate in process-oriented warehouse control, define the Maximum Number of WTs in the Deconsolidation HU and the Maximum Number of WTs in the Putaway HU.

Example

You receive a deconsolidation HU with fifteen WTs, all of whose destination data is assigned to the same activity area. You have set the Maximum Number of WTs in the Deconsolidation HU to ten and the Maximum Number of WTs in the Putaway HU to five. This means that when process-oriented warehouse control is in operation, the HU is directed to a deconsolidation station (see Specify Deconsolidation Station) because the Maximum Number of WTs in the Deconsolidation HU has been exceeded.

There, putaway HUs are created in the course of deconsolidation. After five product WTs have been repacked into the putaway HU, this HU is proposed for completion on the basis of the parameter Maximum Number of WTs in the Putaway HU and is therefore released for the subsequent process step Putaway.

 

But We can achieve the scenario by creating new HU type group( New HU Type ) which will not take part in decon config.

 

Specify Deconsolidation Station

Use

In this IMG activity, you define determination of the deconsolidation station. This process is dependent on the following:

  1. 1. The warehouse number
  2. 2. The source storage type
  3. 3. The handling unit type group (HU type group)
  4. 4. The destination activity area

 

Thanks

AR


Viewing all articles
Browse latest Browse all 2161

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>