Hi Ajay,
(((c) If you have multiple plants and same material is made in multiple plants, then you have to rely on Batch Management in Mfg Plants or Split Valuation in Depot Plant, so that you trace the Material to its Origin (Mfg Plant) and then derive Cost Estimate from that plant))
1. as per above reply. Are you saying that I can derive cost estimate at depot as well although I have material at 'V' and no costing is required(at depot). if that is the case in such case this error would have not come at all.
Example:
P100 - Manufacturing Plant and costing is run at this plant
P101 - Manufacturing Plant and costing is run at this plant
D100 - Depot., No cost estimate
D101 - Depot., No cost estimate
Matrial - M100 in all three plant.
2. How I can derive cost estimate in D100 for material M100 in KEPC. Example pleae.
3. Are the below thing mandatory in KEPC
GLOBAL | BWFKT | Point of valuation |
GLOBAL | VRGAR | Record Type |
GLOBAL | VERSI | Plan version (CO-PA) |
Regards
Ruksana