Re: Valuation with material cost estimate: error with product "XXXX"/KE350 Error

Hi Ajay,

 

(((c) If you have multiple plants and same material is made in multiple plants, then you have to rely on Batch Management in Mfg Plants or Split Valuation in Depot Plant, so that you trace the Material to its Origin (Mfg Plant) and then derive Cost Estimate from that plant))

 

1. as per above reply. Are you saying that I can derive cost estimate at depot as well although I have material at 'V' and no costing is required(at depot). if that is the case in such case this error would have not come at all.

 

Example:

 

P100 - Manufacturing Plant and costing is run at this plant

P101 - Manufacturing Plant and costing is run at this plant

 

D100 - Depot., No cost estimate

D101 - Depot., No cost estimate

 

Matrial - M100 in all three plant.

 

2. How I can derive  cost estimate in D100 for material M100 in KEPC. Example pleae.

 

 

 

3. Are the below thing mandatory in KEPC

 

GLOBALBWFKTPoint of valuation
GLOBALVRGARRecord Type
GLOBALVERSIPlan version (CO-PA)

 

Regards

Ruksana